Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Add for reinforced concrete rods longer than ME.SA m or exclude for reinforced concrete rods shorter than ME.SA m for every KA.SA m when drilling holes in the roof of workings: to standard RIDX-KAME-MERIPU-KANE (soil groups 10-11)

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/