AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| RITO-SA-KAME-KAVO_KAKAMEVO | Electro-welded straight-seam and spiral-seam steel pipes, strength class K38, outer diameter 426 mm, wall thickness 10 mm | m | ||||||||||
| DXME-MEDX-KADX_KAKARI | Stationary electric suction pumping stations, flow rate 140 m3/h, head 37-52 m | Machine hours | ||||||||||
| PU_MEKAKA_KARISA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KADX_KAKARI | Electricity: consumption MEPU.VOSA kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KAMEKA | Stationary electric pumping stations, flow rate 100 m3/h, head 80 m | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KAMEKA | Electricity: consumption METO.RI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||