AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KAME-KADX_KAKARIPU | General-purpose asbestos cord, diameter 3-6 mm | t | ||||||||||
| KAME-ME-KARI-KASA_KAMERIRI | Dry asbestos packings, open weave, round, grade AS, diameter 6-14 mm | t | ||||||||||
| KAME-ME-KARI-KAVO_MEKAPUKA | PMB brand paronite sheet (PON-A, PON-B), thickness from KA.PU to 5 mm | kg | ||||||||||
| KAME-TO-KARI-KARI_KAKAKARI | Argon gas, highest grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-TO-KATO-KALI_KAKAKAME | Acetic acid | kg | ||||||||||
| KAME-TO-KASA-MEKA_KAKAKANE | Crystalline casting graphite, grade GL-1 | kg | ||||||||||
| KAME-TO-KASA-RITO_KAKANERI | Caustic soda, grade TR, technical | t | ||||||||||
| KAME-TO-KASA-RITO_KAMEVOME | Liquid sodium caustic soda | t | ||||||||||
| KAME-TO-KASA-RITO_KARIKAME | Sodium tripolyphosphate, technical grade, grade I | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKARI | Tap water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIPU_KAKAMEKA | Two-component developer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, development time 5-8 min, consumption KA.VO l/m2 | l | ||||||||||
| KAME-LI-KALI-RIPU_KAKARIKA | Two-component fixer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, fixing time 5-10 min, consumption KA.VO l/m2 | l | ||||||||||
| KAME-LI-MEME-KAPU_KAKASARI | Uncoated welding wire SV-08G2S, diameter 2 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIMETO | Welding electrodes for welding low-alloy and carbon steels TMU-21U, E50A, diameter 3-5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIPUPU | Welding electrodes for welding alloyed high-strength and heat-resistant steels TsU-5, diameter RI.SA mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KATOMETO | Tungsten welding electrodes for welding high-alloy and refractory steels | kg | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKADX | Cranes on crawler tracks, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KARI_KARIME | Gamma flaw detectors with a penetrable steel thickness of up to 80 mm | Machine hours | ||||||||||
| DXME-MELI-KARI_KATORI | Ultrasonic flaw detectors, thickness of the product being inspected up to 6000 mm | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Pumps, capacity 200 m3/h, head 25 m, power 22 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Electricity: consumption LI.RINE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 426 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption ME.VORI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||