AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KARI | Bitumen primer | t | ||||||||||
| KAME-RI-KATO-KATO | Mastic | t | ||||||||||
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KARI-KARI_KAKARIME | Wrapping paper, sheet | 1000 m2 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-RIKA-KAVO_KAKARIME | Fireproof impregnated canvas | m2 | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 950 mm, surface density 190 g/m2 | 10 m | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length TO-NE.SA m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MERI-RI-KATO-MEME_KAKASAPU | Glass cloth, density 100 g/m², thickness KA.VO mm | 10 m | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIRI | Mobile electric bitumen boilers with centrifugal agitator, loading capacity 1000 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIRI | Electricity: consumption VO.RISA kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMETO | Machines for cleaning and priming pipes with a diameter of 600-800 mm | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMETO | Electricity: consumption MESA.MEVO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KARIPU | Insulation machines for pipes with a diameter of 600-800 mm | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KARIPU | Electricity: consumption MEKA.KALI kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KASA_KAKADX | Pipe layers, nominal load capacity 35 t | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAVO_KAKATO | Equipment for drying pipes with a diameter of 800 mm | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||