Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RISA-ME-KARI-KAME | Reinforced concrete sleepers for leveling joints | pcs | ||||||||||
| ME_MEKAKA_RIDX | Average work load RI.DX | hrs | ||||||||||
| RISA-ME-KATO-KAME_KAKAKAME | Spring rod terminal CP-TONEDX.MEKARI | pcs | ||||||||||
| RISA-ME-KATO-KAPU_KAKAKAME | Elastic pads, type CP TONEDX.MEKAPU | 100 pcs | ||||||||||
| RISA-ME-KATO-KAPU_KAKAMESA | Steel rail fastening bracket for reinforced concrete rails, type CP-TONEDX.KAKATO | pcs | ||||||||||
| RISA-ME-KATO-KAPU_KAKAMENE | Steel rail fastening bracket for reinforced concrete rails, type CP-TONEDX.MEKAME | pcs | ||||||||||
| RISA-ME-KANE-MEVO_KAMEKASA | Rubber gaskets for rail base, type TsP-538, TsP-638 | 1000 pcs | ||||||||||
| RISA-TO-KAVO-KAME_PUDXSANE | Reinforced concrete sleeper Sh3-D | pcs | ||||||||||
| RISA-TO-MEKA-KAME_METOTOKA | Steel railway track expansion joint, rail type P65, average length 12,500 mm | set | ||||||||||
| RISA-TO-MEPU-KAME_MEDXRIPU | Hexagon head track screws, type TsP 54, diameter M24, length 195 mm | t | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity TO.SA t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 880 kW (1200 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Double-girder gantry cranes for use at link assembly bases, 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Electricity: consumption MEME.TOME kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKAPU | Assembly stands (workshop equipment) | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKAPU | Electricity: consumption NE.KALI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||