AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RISA-ME-KASA-KASA | Broad gauge railway rails, type P65 | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RISA-ME-KATO-KANE_KAKATOTO | Single-coil spring washers, type 1, hole diameter M27 | t | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKATO | Track bolts for fastening rails, diameter M27, length 160 mm, 180 mm, with nut diameter M27 | t | ||||||||||
| RISA-ME-KASA-KAME_KAKAKAME | Double-headed rail plate, type 1P65 | pcs | ||||||||||
| RISA-TO-KATO-KAME_MEKAKARI | Polymer gasket for reinforced concrete sub-rail base of PFK-350 anchor rail fastening, dimensions 200x194x10 mm | pcs | ||||||||||
| RISA-TO-KAVO-KAME_PUDXVOKA | Reinforced concrete sleeper SH 350 | pcs | ||||||||||
| RISA-TO-MEPU-KAME_MEKADXRI | Polyamide pressure insulator for PFK-350 anchor rail fastening, dimensions 53.5x55.6x27 mm | pcs | ||||||||||
| RISA-TO-MEPU-KAME_MEKADXTO | Side insulator made of polyamide for anchor rail fastening PFK-350, dimensions 132x29.6x38.6 mm | pcs | ||||||||||
| RISA-TO-MEPU-KAME_MEMEKAKA | Spring rod clamp for PFK-350 anchor rail fastening, dimensions 125x108x32 mm | pcs | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOLI | Wide gauge platforms with roller conveyor | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 880 kW (1200 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Double-girder gantry cranes for use at link assembly bases, 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Electricity: consumption MEME.TOME kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKAPU | Assembly stands (workshop equipment) | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKAPU | Electricity: consumption NE.KALI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||