AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-NE-KAME-KARI | Plasterboard sheets | m2 | ||||||||||
| KALI-RI-KANE-KAPU | Fasteners and fastening elements for multi-layer wall panels (anchors, brackets, self-tapping screws, washers) | set | ||||||||||
| MEME-RI-METO-KARI | External wooden frame wall panels with insulation filling | m2 | ||||||||||
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MESA-MEPU_KAKAPUSA | Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter TO.SA mm, length 35 mm | 100 pcs | ||||||||||
| MERI-ME-KARI-MEKA_KAKADXLI | Two-layer vapor-permeable wind and moisture protection membrane for ventilated facades and pitched roofs, G2, vapor permeability 953 g/m2*day, strength 150-163 N, with UV protection | m2 | ||||||||||
| MERI-RI-KATO-KARI_KAKAKARI | Mineral wool | m3 | ||||||||||
| MERI-RI-KASA-KASA_KAKAMEVO | Mineral wool slabs with synthetic binder, thermal insulation PM-50, soft, density 46-55 kg/m3 | m3 | ||||||||||
| MEPU-SA-KAPU-KASA_KAMEKAPU | Single-component construction sealing mastic, hardening | t | ||||||||||
| DXME-KASA-KAME_KAMELI | Tower cranes, lifting capacity 8 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMELI | Electricity: consumption NE.VOTO kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 12 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
| DXME-RIME-RIRI_RILIME | Construction and installation guns | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||