Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Auxiliary work during the development and placement of soil using floating dredgers without trestles in a profile structure, in a dump with a bunding device and in a stack, dredger productivity (by soil): 80 m3/h

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/