AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEVO-ME-KADX-KAME | Steel gas ball valves with equal passage | pcs | ||||||||||
| RITO-SA-KARI-KARI | Electric welded straight seam steel pipes | m | ||||||||||
| RITO-VO-KATO-KALI | Steel-polyethylene connecting element | pcs | ||||||||||
| RITO-VO-KATO-MERI | Steel flanges | set | ||||||||||
| RIPU-TO-KATO-MEME | Polyethylene pipes | m | ||||||||||
| RIPU-TO-KASA-KALI | Polyethylene couplings with embedded electric heaters | pcs | ||||||||||
| RIPU-TO-KASA-MEDX | Polyethylene connecting parts with built-in electric heaters (tees, elbows, adapters, plugs) | pcs | ||||||||||
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-KAVO_KAKAKAME | PMB paronite gaskets, thickness 1 mm, diameter 50 mm | 1000 pcs | ||||||||||
| KAME-RI-KAME-KARI_KAKATOME | Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V | t | ||||||||||
| KAME-TO-KAME-KALI_KAKAKADX | Rectified technical ethyl alcohol, grade I | kg | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIDX_KAKATOME | Cable | t | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKAMEPU | Steel bolts with hexagonal heads, complete with hexagonal nuts and flat round washers, thread diameter M16, bolt length 25-200 mm | t | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | m3 | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | t | ||||||||||
| MEPU-PU-KAME-MEDX_KAKAKATO | Primer HS-059 | t | ||||||||||
| MEPU-PU-KAPU-KAPU_KAKAMEKA | Organosilicon enamel KO-811, KO-811K, colored | t | ||||||||||
| MEPU-SA-KADX-KALI_KAKATOKA | Solvent P-4 | t | ||||||||||
| RITO-SA-KARI-KARI_KAKALISA | Electric-welded straight-seam steel pipes made of St2 and 10 steel grades, outer diameter 159 mm, wall thickness 5 mm | m | ||||||||||
| RITO-VO-KAPU-KANE_KAKANETO | 90° elbow with a radius of curvature R=ME.SA Du for pressures up to 16 MPa, nominal diameter 50 mm, outer diameter 57 mm, wall thickness 3 mm | pcs | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATODX | Machines for socket welding of plastic pipes with a diameter of up to 200 mm | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATODX | Electricity: consumption KA.PUPU kWh/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_MESARI | Positioners-centers for assembling and welding polyethylene pipes with a diameter of up to 63 mm | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MERI_KAKATO | Hand shears with ratchet mechanism for polyethylene pipes with a diameter of up to 63 mm | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||