AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKATOME | Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V | t | ||||||||||
| KAME-TO-KAME-KAME_KAKAKAME | B-70 aviation gasoline | t | ||||||||||
| KAME-TO-KASA-TOVO_KATOLIME | Technical stearic acid | kg | ||||||||||
| KAME-LI-KANE-MEPU_KAKATOVO | Sealing tapes made of cotton-polyester fabric impregnated with bitumen compound, width 75 mm, thickness KA.VO mm | m | ||||||||||
| KAME-LI-KALI-RIDX_KARIPUME | Weather-resistant nylon clamps (ties), black, dimensions 370x4.8 mm | 10 pcs | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 35-56 mm, shelf thickness 3-5 mm | t | ||||||||||
| MEKA-TO-KARI-KATO_KAKATONE | Tin-lead antimony solders, POSSu 30-2 grade | kg | ||||||||||
| RIKA-RI-KARI-KAME_KAKAMEVO | Conductor bushings, dimensions 10x4.8x16 mm | 1000 pcs | ||||||||||
| DXME-MEME-KAME_KAMERI | Installation machines for laying and installing cables based on a vehicle | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||