AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KATO_KAKARITO | Polyethylene tapes with adhesive layer, transparent, width 20 mm, thickness KA.KAVO mm | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKATOPU | Galvanized steel bolts with hexagonal heads and galvanized hexagonal nuts, bolt and nut thread diameter M12, bolt length 20-160 mm | kg | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | t | ||||||||||
| KAVO-TO-KALI-KAME_KAKAPURI | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 40x4 mm | t | ||||||||||
| MERI-ME-KARI-KANE_KAKAPURI | RPP-300 roofing felt | m2 | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEMEPU | MA-025 oil paint, colored | t | ||||||||||
| MEPU-PU-KATO-METO_KAKAKARI | HV-784 varnish | t | ||||||||||
| RIKA-ME-KARI-RITO_KAKAVORI | Flexible jumpers, type PGS-50 | 10 pcs | ||||||||||
| RIPU-ME-KARI-KAME_KAKAMESA | Galvanized metal double-claw clamp with two quick-release locks and rubber profile for securing pipes, M8 fastening nut, diameter from 32 to 37 mm | pcs | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOPU | Auxiliary mine winches with a pulling force of RIPU.SATO kN (RI.SA t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOPU | Electricity: consumption ME.KANE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||