AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MELI-KATO | Medium-grain grinding stone | kg | ||||||||||
| KAVO-ME-KARI-RISA | Fastening parts | t | ||||||||||
| METO-RI-KAME-KAME | Shaped facing stones | m3 | ||||||||||
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KARI-MEKA_KAKAKASA | Role paper | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-METO_KAKAKAME | Acid-resistant andesite flour, grade A | t | ||||||||||
| KAME-LI-MEKA-MELI_KAMEPUME | Pumice | kg | ||||||||||
| KAME-LI-MELI-KASA_KAKARIME | Carborundum | kg | ||||||||||
| KAME-LI-MELI-KAVO_KAKATORI | Polishing powder | kg | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KATO-ME-KAME-KAME_KAKAKARI | G-3 construction gypsum | t | ||||||||||
| KAPU-TO-KAME-KALI_KAKARISA | Plaster mortar, lime, M100 | m3 | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 100 mm and above, thickness 100 mm and above, grade III | m3 | ||||||||||
| MEPU-SA-KALI-KAPU_KARIKAME | Acid yellow dye | t | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 500 kg, lifting height 45 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKARI | General-purpose electric hoists, load capacity KA.SA t | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||