AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MESA-KANE_KAMERIRI | Steel construction nails, diameter ME.VO mm, length 50-60 mm | t | ||||||||||
| MEME-ME-KARI-KADX_KAKAKATO | Mine props made of coniferous wood (pine, fir), length KA.DX-PU m, diameter 7-24 cm | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| DXME-KATO-KANE_KAMETO | Loading and delivery machines with internal combustion engine on pneumatic wheels, load capacity up to 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption RI.DXLI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KADX_MERIME | Multifunctional auxiliary machines with scissor hydraulic platform, platform load capacity up to 1500 kg | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KAVO-KASA_KAPUSA | Concrete placing units for mechanized placing of concrete mix behind formwork in mine workings with a cross-section of at least VO.PU m2, capacity up to 5 m3/h, hopper volume KA.SA m3 | Machine hours | ||||||||||
| PU_MEKAKA_KATOSA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KAPUSA | Electricity: consumption TO.NETO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity RI.SA m3 | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKALI | Mine concrete mixers, drum volume up to 3 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||