Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Concreting of monolithic reinforced concrete structures of the above-ground part of buildings using a "bucket crane" scheme, with a building height of over 40 m to 57 m: columns with the smallest side of the cross section over 500 mm

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/