AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KALI-TO-KARI-MEME | Steel structures | t | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | t | ||||||||||
| ME_MEKAKA_PULI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter ME.ME mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIVO | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade II | m3 | ||||||||||
| MEME-RI-MEME-KARI_KAKAMEME | Bakelized plywood, grade FBS, thickness 18 mm | m3 | ||||||||||
| RIPU-TO-KARI-KARI_KAKAKAPU | Polypropylene pipes for drainage systems, diameter 110 mm | m | ||||||||||
| DXME-KASA-KAME_KAMERI | Tower cranes, lifting capacity 10 t, lifting height up to 150 m | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMERI | Electricity: consumption DX.TOME kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||