AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MENE-KAPU | Formwork inventory (depreciation) | set | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| RIPU-RI-KATO-KAME | Concrete mixer | m | ||||||||||
| ME_MEKAKA_RIDX | Average work load RI.DX | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKARIRI | Emulsol lubricant | kg | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MERI-KASA_KAKASATO | Non-woven polyester geotextile, needle-punched, surface density 200 g/m2 | m2 | ||||||||||
| KAME-LI-MESA-MEPU_KAKADXRI | Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 6 mm, length 90 mm | kg | ||||||||||
| KAPU-TO-KARI-KADX_MESATOPU | Fast-setting, non-shrinking, cement-based dry mixes containing polymer fibers for repairing concrete and reinforced concrete structures, thixotropic type, class R3, F300, W16, aggregate size up to 3 mm, consumption MEVO.SA kg/m2 | kg | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKAME | Knitting wire | kg | ||||||||||
| MEME-ME-KATO-KAME_KAKARINE | Edged hardwood bars (birch, linden), natural moisture content, length RI-TO.LISA m, width 20-70 mm, thickness 80-100 mm, grade III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKARIME | Edged board of hardwood (birch), natural moisture content, length PU-NE.SA m, all widths, thickness 20-22 mm, grade II | m3 | ||||||||||
| MEPU-SA-KAME-KALI_KAMETOPU | Single-component silicone-based sealant, neutral, universal | l | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMENE | Truck-mounted cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KAMEME | Concrete pumps, capacity 65 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-METO-KAME_KATOVO | Watering machines, tank capacity 6 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||