AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAPU-TO-KAME-KADX | Ready-made finishing mortar | m3 | ||||||||||
| MEME-ME-KATO-KANE | Boards | m2 | ||||||||||
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KAME_MEKARIRI | Bitumen road oil BND 60/90 | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KARI-RI-KATO-KAME_KAKAMERI | Rubble stone M 800, size from 150 to 500 mm | m3 | ||||||||||
| KATO-ME-KARI-KATO_KAKAMEME | Quicklime, grade I | t | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | t | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length TO-NE.SA m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 100 mm and above, thickness 100 mm and above, grade III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALISA | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 30-40 mm, grade III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| MENE-RI-KATO-KARI_KAKAKAME | Standard rolled turf | m2 | ||||||||||
| MENE-RI-KATO-KARI_KAKARIME | Forest moss | m3 | ||||||||||
| DXME-KALI-KAPU_KAKARI | Surface vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Electricity: consumption KA.NEVO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption SA.DXPU kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKAME | Mobile power stations, power 2 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||