The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAME-KAVO | Precast reinforced concrete structures | m3 | ||||||||||
| ME_MEKAKA_TOKA | Average workload TO.KA | hrs | ||||||||||
| KAME-RI-KAME-KAME_MEKARIRI | Bitumen road oil BND 60/90 | t | ||||||||||
| KAME-TO-KAME-KAME_KAKAMEKA | Gasoline solvent | kg | ||||||||||
| KARI-RI-KASA-KAPU_RIKADXKA | Crushed rock from dense rock for construction work M 800, fraction 20-40 mm | m3 | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KAPU-RI-KARI-KAME_KAMEVOPU | LA11 NN hot mastic asphalt concrete mixes on PBV | t | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEME | Ready-mixed masonry mortar, cement, M25 | m3 | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight ME.SA-PU.SA kg | t | ||||||||||
| KAVO-TO-KALI-KAME_KAKANEKA | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x10 mm | t | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption SA.DXPU kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARISA | Electric tampers | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARISA | Electricity: consumption KA.LITO kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKARI | Mobile power stations, 4 kW capacity | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|