Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Construction of a roadbed base using the cold recycling method with a thickness of 15 to 25 cm using a regenerator-mixer with a cutting width of RI.SA m with the addition of: mineral additives

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/