AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KAPU | Heavy concrete mixes for transport construction | m3 | ||||||||||
| KALI-RI-KALI-MEME | Movable steel pipe support made of hot-rolled profiles | t | ||||||||||
| KAVO-PU-KAME-KARI | Embedded parts | t | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | t | ||||||||||
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKARIRI | Emulsol lubricant | kg | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-MEPU_KAKAPUME | Polyethylene-laminated fabric-based tape with adhesive layer on one side for sealing and insulation, gray, width 48 mm, thickness KA.MEVO mm | 10 m | ||||||||||
| KAME-LI-KALI-MERI_KAKARIRI | Polyethylene film, thickness KA.RI-KA.SA mm | m2 | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MERI-KASA_MEKAMEVO | Non-woven polypropylene geotextile, needle-punched, thermally bonded, surface density 550 g/m2 | m2 | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAPU-TO-KARI-KAVO_KAKARIKA | Polymer-cement-based dry waterproofing mixtures for protecting the surfaces of concrete, reinforced concrete structures, and stone used in underground conditions, class B45 (M600), F300, W10-W20, aggregate size up to KA.LIKA mm, consumption TO.SA kg/m2 with a layer thickness of 2 mm | kg | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKARITO | Simple construction forgings (staples, fasteners, clamps), weight up to ME.NE kg | kg | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKARI | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 12U-24U, No. 12P-24P | t | ||||||||||
| KAVO-TO-MERI-KALI_KAKAKAME | Metal guides for vibrating screeds (rail forms) | m | ||||||||||
| KAVO-PU-KATO-KATO_KAKATOSA | Hot-rolled reinforcing steel with periodic profile, class A-III, diameter 20-22 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAMERITO | Edged boards of coniferous species, dry, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade I | m3 | ||||||||||
| MEME-RI-MEME-KARI_KAKAMEME | Bakelized plywood, grade FBS, thickness 18 mm | m3 | ||||||||||
| MEME-TO-KATO-MESA_MEKAMEPU | Plastic reinforcement protective layer fasteners, star shape, concrete protective layer thickness 40 mm | 100 pcs | ||||||||||
| DXME-KASA-KASA_KAMENE | Truck-mounted cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electric winches with a pulling force of up to MERI.RINE kN (ME.RISA t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electricity: consumption KA.RINE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KAMERI | Concrete pumps, capacity 90 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Surface vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Electricity: consumption KA.NEVO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAPUME | Vibrating screeds | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKATO | Concrete mixer trucks, drum capacity 6 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAPU | Flatbed trucks, load capacity up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KASAME | Trailer tanks, capacity RI.SA m3 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KARI_KAKAME | Compressor stations, pressure 245 kPa (RI.SA atm), capacity 40 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KARI_KAKAME | Electricity: consumption PUTO.SANE kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Combined electric press shears, nominal force 630 kN, power 5 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Electricity: consumption ME.SAVO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Rebar bending machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Electricity: consumption KA.DXDX kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|