AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | t | ||||||||||
| MEME-ME-KATO-KANE | Boards | m2 | ||||||||||
| ME_MEKAKA_TOKA | Average workload TO.KA | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-MERI_KAKARIPU | Polyethylene film, thickness KA.MESA mm | m2 | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KATO-ME-KARI-KATO_KAKAMEME | Quicklime, grade I | t | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter ME.ME mm | t | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKARI | Hot-rolled wire in coils, diameter NE.TO-NE.SA mm | t | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| DXME-KASA-KAME_KAMELI | Tower cranes, lifting capacity 8 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMELI | Electricity: consumption NE.VOTO kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||