| KAPU-ME-KARI-KATO | Heavy concrete mixes for road and airfield pavements | m3 | ||||||||||
| ME_MEKAKA_RIDX | Average work load RI.DX | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MELI-KANE_KAKAMESA | Diamond cutting segmented circle, diameter 1000 mm, segment 4.4x10x40 mm | pcs | ||||||||||
| KAME-LI-MELI-KADX_KAKANERI | Diamond ring drill bit, diameter 20 mm | pcs | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | m3 | ||||||||||
| MEPU-RI-KAME-KANE_KAKAMERI | Paraffin emulsion film-forming coating for road works, dry matter content 15-35%, pH 7-9, color white, yellow | t | ||||||||||
| MEPU-RI-KASA-KAME_KAMEKAVO | Penetrating compound for strengthening and dedusting concrete surfaces | kg | ||||||||||
| DXME-KASA-METO_KAKAME | Flatbed trucks, load capacity up to 6 tons, with crane-manipulator, load capacity 4 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUDX | Manual and lever winches with a pulling force of up to DX.VOME kN (1 t) | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIPU | Mobile mortar mixers, drum capacity 65 l | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KARIME | Concrete pavers with sliding forms, power 70 kW (92 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KANE_KAMEME | Self-propelled joint cutters for hardened concrete, maximum cutting depth 480 mm, power 62 kW (84 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KATOVO | Watering machines, tank capacity 6 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKATO | Concrete mixer trucks, drum capacity 6 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKAME | Dump trucks, load capacity up to 7 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKARI | Mobile screw compressors with internal combustion engines, pressure up to ME.TO MPa (13 atm), capacity up to 12 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | High-pressure painting units for painting structural surfaces, power 1 kW | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | Electricity: consumption KA.RITO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUSA | Batch mixers with Z-shaped blades for mixing rubber adhesive | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUSA | Electricity: consumption RI.LIRI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||