Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Construction of the upper layer of the base or lower layer of the pavement from type E asphalt-granular concrete mixture using an asphalt paver with a paving width of 2 to 5 meters: for each centimeter of change in coating thickness, add or subtract from the standard RILI-KANE-KAPUME-KAME

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/