AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KARI | Heavy concrete mixes for hydraulic structures | m3 | ||||||||||
| KASA-ME-KAVO-MEPU | Precast reinforced concrete structures | m3 | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | t | ||||||||||
| MEME-ME-KATO-KANE | Boards | m2 | ||||||||||
| ME_MEKAKA_TOTO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 950 mm, surface density 190 g/m2 | 10 m | ||||||||||
| KAVO-TO-KATO-KAPU_KAKASAKA | Black wire, diameter 3 mm | t | ||||||||||
| KAVO-PU-KAME-KARI_KAKAMETO | Embedded and overlay parts manufactured using welding, bending, drilling (punching) of holes (if one of these operations or the entire list is present in any combination), supplied separately | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II | m3 | ||||||||||
| MEME-ME-KATO-KAME_KAKANENE | Edged timber of coniferous species (spruce, pine), natural moisture content, length RI-NE.SA m, width 100 mm and above, thickness 100 mm and above, grade II | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIPU | Edged boards of coniferous species, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 30-40 mm, grade II | m3 | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAVO_KAKALI | Pneumatic wheeled cranes, lifting capacity 30 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAKALI | Barges operating in closed water areas are non-self-propelled, with a carrying capacity of 400-450 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKAPU | Diesel tugs for operation in enclosed waters, power 221 kW (300 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKANE | Floating cranes operating in enclosed waters, self-propelled, 100 tons | Machine hours | ||||||||||
| PU_MEKAKA_KALIDX | Personnel: 8 persons-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||