AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_RINE | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KARI-KATO_KAKAKATO | Packaging paper coated with fuel oil | t | ||||||||||
| KAME-LI-KARI-KADX_KAKAKARI | Paper twine, diameter RI.SA mm | kg | ||||||||||
| KAME-LI-KADX-KAME_KAKAMERI | Waterproof safety ammonite in T19 cartridges, diameter 36-37 mm | t | ||||||||||
| KAME-LI-KADX-KARI_KAKATOTO | ED-ZD electric detonators | 1000 pcs | ||||||||||
| KAME-LI-KADX-KATO_KAKAMEME | Detonating cord | 1000 m | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight ME.SA-PU.SA kg | t | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length TO-NE.SA m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEME-RI-METO-KANE_KAKAMETO | Floor panels, thickness 40 mm | m2 | ||||||||||
| MEPU-SA-KAPU-KATO_KAKAKAPU | Non-hardening, frost-resistant construction sealant made of synthetic rubber, fillers, plasticizer, and additives | t | ||||||||||
| RIME-RI-KATO-KADX_KAKAKAPU | PRN wire, cross-section RI.SA mm2 | 1000 m | ||||||||||
| DXME-KAME-KAME_KATOVO | Bulldozers, power 121 kW (165 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KARI_KAKATO | Light motor graders, power 77 kW (105 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.SA m3 | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KAME_KARIRI | Scraper units for constructing underwater trenches with a bucket capacity of ME-ME.SA m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||