Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Control point (CP) and monitored point (MP) equipment with the volume of incoming signals: on PU (IP) 1024TS, 512TU, 512TIT, 512 integrated television measurement (ITI)

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/