AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MELI-KANE | Diamond cutting disc | pcs | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MESA-KATO_KAKAPUTO | Construction anchor bolts with nuts | t | ||||||||||
| KAME-LI-MELI-KADX_MERIPUTO | Drill bit with carbide tip, SDS-max shank for hammer drilling holes in hard materials, total length 320 mm, diameter 16 mm | pcs | ||||||||||
| DXME-KANE-KATO_KATOSA | Auxiliary mine winches with a pulling force of PUDX.KASA kN (5 t) | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electric hoists, load capacity 5 t | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electricity: consumption KA.PURI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_TODXME | Wall saws, maximum cutting depth 730 mm | Machine hours | ||||||||||
| DXME-RIME-RIRI_TODXME | Electricity: consumption DX.DX kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||