AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KARI-KAPU | Drilling rods | pcs | ||||||||||
| KAME-PU-KATO-KAME | Bentonite powders | t | ||||||||||
| KAVO-PU-KARI-KATO | Reinforcing frames | t | ||||||||||
| RITO-TO-KAME-KATO | Seamless steel casing pipes, with short and normal thread lengths, with threaded couplings, safety nipples and rings made of steel of strength groups C and D | m | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKASAME | Grease, solid, fat-based, type Z | kg | ||||||||||
| KAME-PU-KAME-KATO_KAMEPULI | Three-cone drill bit III 1460K-PV | pcs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KANE-KASA_KAKAPUME | Rubberized cotton insulating tape for electrical installation and repair work, black, width 20 mm, thickness KA.TOSA mm | m | ||||||||||
| KAME-LI-MEME-KALI_KAKARIME | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 2 mm | t | ||||||||||
| KATO-RI-KAME-KAME_KAKAKATO | Portland cement without additives for general construction CEM 0 42.5N | t | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 1-8 mm | t | ||||||||||
| RITO-VO-KAME-KALI_MEKAKAPU | Polymer compression connectors, diameter 50x50 mm | 10 pcs | ||||||||||
| RIPU-TO-KAPU-MEME_MEKAKAKA | Polyvinyl chloride plastic pipe, outer diameter 51 mm | m | ||||||||||
| DXME-KAPU-KAME_SAMEPU | Hydraulic crawler-mounted roller bit drilling rigs, drilling depth up to 45 m, hole diameter 160-230 mm | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_SAMEKA | Hydraulic jacks, load capacity up to 1200 t | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Mortar pumps, capacity 6 m3/h | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Electricity: consumption ME.RIPU kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Stationary mortar mixers for preparing cement-water and other mortars, capacity 350 l | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Electricity: consumption ME.TORI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KATOME | Hydraulic pump stations for driving hydraulic jacks, pressure up to 10 MPa | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KATOME | Electricity: consumption ME.VORI kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||