AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-TO-KAVO-KARI | Angle steel | t | ||||||||||
| KAVO-PU-KATO-KATO | Periodic profile reinforcing steel | t | ||||||||||
| MEME-ME-KATO-KANE | Edged boards | m3 | ||||||||||
| RITO-SA-KARI-KARI | Steel pipes | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MESA-KATO_KAKAMEVO | Steel bolts with hexagonal heads, complete with hexagonal nuts and flat round washers, thread diameter M30, bolt length 60-300 mm | t | ||||||||||
| KAME-LI-MESA-KATO_MEKAKARI | Bolts for mounting steel structures, complete with nuts and washers, diameter 24-48 mm, length 55-300 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKATORI | Mechanically processed construction forgings (brackets, fasteners, clamps), weight up to 10 kg | kg | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 9-12 mm | t | ||||||||||
| KAVO-TO-KANE-KAME_KAKARIPU | Hot-rolled corrugated steel sheet, steel grades St3sp, St3ps, thickness 2-6 mm | t | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKARI | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 12U-24U, No. 12P-24P | t | ||||||||||
| MEME-ME-KARI-KAME_KAKAMERI | Round coniferous timber, debarked, length TO-NE.SA m, diameter 14-24 cm, grade I-III | m3 | ||||||||||
| DXME-KATO-MEDX_KADXME | Hand-held pneumatic wrenches for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUDX | Manual and lever winches with a pulling force of up to DX.VOME kN (1 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electric winches with pulling force up to TOME.TODX kN (TO.RI t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electricity: consumption KA.TODX kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKAME | Manual lever hoists | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKATO | Tipping wagons, capacity KA.VO m3 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||