Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Drilling inclined tunnels with a cross-section of more than 20 to 60 m2 from top to bottom with an inclination angle of more than 31 to 45 degrees using the continuous face method without temporary supports with monolithic lining in soils of group: 8

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/