Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Drilling of the lower part of the tunnel with a cross-section of up to 60 m2 with preliminary breaking and drilling of holes with drilling machines using the lower bench method without temporary supports in soils of group: 10

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/