AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUDX | Worker Category 1 | hrs | ||||||||||
| KAME-LI-RIKA-KAVO_KAMERIRI | Cotton wipes, dimensions 400x400 mm, surface density from 105 to 130 g/m2 | m2 | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | t | ||||||||||
| MEME-ME-KATO-KASA_KAKANENE | Unedged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250, thickness 30-50 mm, grade IV | m3 | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKAME | Technical acetone, grade I | kg | ||||||||||
| MEPU-SA-KADX-MEME_KAMEKARI | White spirit | kg | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption SAME.MESA kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electric bridge cranes, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electricity: consumption PUNE.LI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEKA | Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electric winches with pulling force up to TOME.TODX kN (TO.RI t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electricity: consumption KA.TODX kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 550 kW (750 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||