AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KALI-RIDX_KAMEPUME | PTFE-4 film, grade IO | t | ||||||||||
| KAME-LI-KADX-KAME_KAKAKAME | Ammonite 6ZhV in cartridge form, diameter 32 mm | t | ||||||||||
| KAME-LI-KADX-KAME_KAKAKARI | Ammonite 6ZhV in powder form | t | ||||||||||
| KAME-LI-KADX-KARI_KAKATOME | ED-KZ waterproof short-delay electric detonators | 1000 pcs | ||||||||||
| KAME-LI-KADX-KATO_KAKAKAME | APRN wire for blasting operations, VP brand | 1000 m | ||||||||||
| KAME-LI-KADX-KATO_KAKAMEME | Detonating cord | 1000 m | ||||||||||
| DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_MEKANE | Single-bucket diesel excavators on pneumatic wheels, bucket capacity KA.RISA m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KATO_MEMERI | Special-purpose all-terrain vehicles, load capacity up to ME.SA tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||