AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KALI_KAKAKARI | Plastic mounting tapes for wire bundling, fastened with plastic buttons, width 10 mm | 10 m | ||||||||||
| KAME-LI-KANE-MERI_KAKAKAVO | PVC insulating tape with adhesive layer on one side for electrical installation and repair work, blue, width 15 mm, thickness KA.RI mm | m | ||||||||||
| MEPU-RI-KANE-KASA_KARIMERI | Thixotropic epoxy compound | kg | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | kg | ||||||||||
| MEPU-SA-KADX-KAPU_KAMEMEME | Hardener No. 1 | t | ||||||||||
| RIKA-ME-KARI-RITO_KAKAVORI | Flexible jumpers, type PGS-50 | 10 pcs | ||||||||||
| RISA-RI-KAME-KAME_KAKAKAME | A671 marking tags | 100 pcs | ||||||||||
| DXME-KADX-KARI_KAKADX | Non-tipping wagons, capacity TO.TO m3 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||