| KAME-PU-KATO-KANE | Mineral composite ampoules for securing rope anchors | pcs | ||||||||||
| KAME-LI-MESA-KAME | Metal rope anchor | pcs | ||||||||||
| KAME-LI-MESA-KAME | Flexible steel rope sling | pcs | ||||||||||
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-PU-KAME-KANE_KAMENENE | Rock drill bit for drilling holes, internal thread R17, diameter 30 mm | pcs | ||||||||||
| KAME-PU-KATO-KAPU_KAKAMEME | Hexagonal hollow drill steel 55S2, outer size 22 mm, inner diameter NE.SA mm | t | ||||||||||
| KAME-PU-KATO-KANE_KARIRIRI | Retaining element with petals for fixing the ampoule in a hole with a diameter of 24 mm to 28 mm | pcs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| DXME-KATO-KANE_KAMETO | Loading and delivery machines with internal combustion engine on pneumatic wheels, load capacity up to 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KATO-MEKA_KAKAVO | Hand-held pneumatic drilling machines for use with mobile compressor units, drilling diameter up to 35 mm | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption RI.DXLI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KADX_MERIME | Multifunctional auxiliary machines with scissor hydraulic platform, platform load capacity up to 1500 kg | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity RI.SA m3 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||