Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KAKAPUME | Welding electrodes for welding low-alloy and carbon steels E55, diameter 4 mm | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKARITO | Simple construction forgings (staples, fasteners, clamps), weight up to ME.NE kg | kg | ||||||||||
| RISA-ME-KAME-KAPU_KAKATOME | Coniferous wood sleeper, untreated, for broad gauge railways, type I | pcs | ||||||||||
| DXME-KASA-KAPU_KAKANE | Electric bridge cranes, lifting capacity 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKANE | Electricity: consumption SA.LIVO kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKADX | Cranes on crawler tracks, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KALI_KAKATO | Railway cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electric winches with a pulling force of up to PUDX.KASA kN (5 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electricity: consumption KA.SATO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|