AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KASA-MENE | Reinforced concrete hollow piles with closed bottom end | m3 | ||||||||||
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKASAPU | BN-90/10 petroleum bitumen for construction | t | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAME-LI-MENE-KASA_KAKAKAME | External steel scaffolding, permissible load up to 750 kg, length 1500-2400 mm, width 1500-2200 mm, guardrail height 1300 mm | t | ||||||||||
| KAME-LI-RIKA-KATO_KAKAMERI | Jute burlap | m2 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIKA | Edged board of coniferous species, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 25 mm, grade II | m3 | ||||||||||
| MEPU-PU-KARI-KAPU_KAMELISA | MA-15 oil paint, iron red | t | ||||||||||
| DXME-KARI-KAME_KAKASA | Low-frequency electric vibratory pile drivers for driving pile casings, eccentric moment MERIPU.PU kgm, centrifugal force 604 kN | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KAME_KAKASA | Electricity: consumption PUPU.SASA kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKAME | Tugs, power 110 kW (150 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKASA | Floating cranes for working in enclosed water areas, self-propelled, 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-MEME_KAKAME | Pontoons for use in enclosed water areas, 40 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||