AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KASA-MENE | Reinforced concrete piles | m3 | ||||||||||
| ME_MEKAKA_PUME | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAKARI | Rolled vulcanized rubber plates | kg | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight ME.SA-PU.SA kg | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANEME | Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade I | m3 | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAVO_KAKALI | Pneumatic wheeled cranes, lifting capacity 30 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKARI | Tractor units, load on the fifth wheel coupling up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAMEKA | Non-self-propelled barges operating in open waters, lifting capacity 250 t | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKADX | Diesel tugs operating in open waters, power 294 kW (400 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 4 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAMEKA | Diesel tugs operating in open waters, power 552 kW (750 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KANERI | Personnel: 5 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KAVO_KAKAME | Floating coppers operating in closed water areas, 6 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASARI | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||