Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Initial injection of grout for prefabricated lining of tunnels with a diameter of more than PU.SA to 6 m, constructed using conventional shields, in non-flooded faces or with water inflow in the face of up to 5 m3/hour in soils: groups 4-11

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/