Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Initial injection of mortar for prefabricated lining of inclined tunnels constructed without a shield, with water inflow at the working face up to 5 m3/hour in soils of group: 4-5

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/