AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAME-METO | Precast reinforced concrete slabs for carpet | m3 | ||||||||||
| MEVO-SA-KAVO-KAPU | Carpet | pcs | ||||||||||
| MEVO-SA-KAVO-MEVO | Reference electrodes with potential sensor | pcs | ||||||||||
| RIME-ME-KAVO-KASA | Control cables | m | ||||||||||
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKATOME | Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V | t | ||||||||||
| KAME-TO-KAME-KATO_KAKAKARI | Kerosene for technical purposes | t | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KATO_KAKAKAME | Anti-corrosion polymer-asphalt tapes, heat-resistant PVC film with an adhesive layer on one side and an anti-adhesive coating on the other for pipeline insulation, width 450 mm, thickness 2 mm | m2 | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MELI-MEME_KAKAKARI | Sanding paper | m2 | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | m3 | ||||||||||
| KAVO-TO-KALI-KAME_KAKATOVO | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 30x5 mm | t | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKAME | Technical acetone, grade I | kg | ||||||||||
| RISA-RI-KAME-KAME_KAKAMEVO | Plastic marking tags U134 | 100 pcs | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||