| KAME-LI-MEDX-KARI | Rubber sealing rings for sealing the joints between the support disc of the injection caps and the support cup | pcs | ||||||||||
| KAME-LI-MEDX-KARI | Rubber sealing rings for reinforcement cables to ensure tightness | pcs | ||||||||||
| KALI-RI-KALI-METO | Metal injection caps | t | ||||||||||
| ME_MEKAKA_PURI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-KARI_KAKANESA | Galvanized steel bolts with hexagonal heads, thread diameter M16 (M18), length 25-200 mm | t | ||||||||||
| KAME-LI-MELI-KALI_KAKASARI | Straight profile grinding wheel, grinding material grade 25A, dimensions 150x20x32 mm | pcs | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | kg | ||||||||||
| KAVO-TO-KATO-KASA_KAKAMEME | Low-carbon galvanized steel wire for various purposes, diameter ME.ME mm | t | ||||||||||
| MEPU-SA-KAME-KANE_KAKAMERI | Non-hardening elastic polyurethane sealant, highly resistant to aggressive environments, for sealing and tightening threaded and flanged connections, metal and plastic parts and components | kg | ||||||||||
| DXME-KASA-KAME_KAMEVO | Tower cranes, lifting capacity 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMEVO | Electricity: consumption LI.VOPU kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electric winches with a pulling force of up to PUDX.KASA kN (5 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electricity: consumption KA.SATO kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electric hoists, load capacity 5 t | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electricity: consumption KA.PURI kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMEPU | Mobile compressors, pressure RI.SA MPa (25 atm), capacity 34 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||