AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| MEME-TO-KATO-MESA_KAKAMEME | PVC insulation edge | kg | ||||||||||
| RIKA-ME-KARI-MEPU_KAKAKARI | Earring Sr-PU.SA 075 | pcs | ||||||||||
| RIKA-ME-KARI-MESA_KAKAMESA | Copper wire connector (SOM) 062-1 | pcs | ||||||||||
| RISA-RI-KAME-KAPU_KAKAKASA | Copper insert for suspending copper or bronze wires and cables in saddles, dimensions 162x54x22 mm | pcs | ||||||||||
| RISA-RI-KAME-KANE_KAKAKATO | End collet clamp KS-086 | pcs | ||||||||||
| RISA-RI-KAME-KANE_KAKADXPU | KS-085 butt clamp | pcs | ||||||||||
| RISA-RI-KAME-MEKA_KAKAKANE | Rocker arm made of two equilateral triangular galvanized steel plates 12 mm thick, 124 mm long, with 24 mm diameter holes at the corners of the plates and three rollers with split pins for connecting smooth-rod insulators, permissible total load 36 kN, breaking load class 100 kN | pcs | ||||||||||
| RISA-RI-KAME-MENE_KAKAKASA | Single saddle for pestle KS-009 | pcs | ||||||||||
| RISA-RI-KAME-RIKA_KAKATOME | Galvanized steel rod with two mounting lugs rotated 90° relative to each other, diameter 20 mm, length 1000 mm | pcs | ||||||||||
| RISA-RI-KAME-RIME_KAKAPURI | KS-078 locks | 100 pcs | ||||||||||
| RISA-RI-KAME-RIME_KAKANEME | KS-082 connecting plate | pcs | ||||||||||
| RISA-RI-KARI-KAVO_KAKAKAVO | Steel fastening assembly for tubular bracket on reinforced concrete post, post diameter 300-320 mm | pcs | ||||||||||
| RISA-RI-KARI-KAVO_KAKAKADX | Steel fastening assembly for tubular bracket on metal post in a clamp, width of support post channel 250-300 mm, width of support post 320-460 mm | pcs | ||||||||||
| DXME-KADX-KAME_KAKATO | Railway vehicles for installation work on the contact network, tension during wire rolling up to 35 kN, technological movement speed up to 5 km/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAME_KAKALI | Railcars for working on contact networks with a crane-manipulator and a wire positioning module, suspension height up to MEKA.SA m | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAME_KAMEME | Railcars for operation on a contact network with an insulated mounting platform and a crane unit equipped with removable cradles | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||