| KAPU-ME-KARI-KATO | Heavy concrete mixes for road and airfield pavements | m3 | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| KAME-RI-KATO-KALI_KAKARITO | Bitumen road emulsion | t | ||||||||||
| KAME-TO-KAME-KANE_KAKASAME | Grease, solid, fat-based, type Z | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-MERI_KAKARIPU | Polyethylene film, thickness KA.MESA mm | m2 | ||||||||||
| KAME-LI-KALI-RINE_KAKATORI | Twisted polyamide cord, diameter 2 mm | t | ||||||||||
| KAME-LI-MESA-KARI_KAKASAME | Anchor bolts | t | ||||||||||
| KAME-LI-MESA-KANE_KAMERIRI | Steel construction nails, diameter ME.VO mm, length 50-60 mm | t | ||||||||||
| KAME-LI-MESA-KALI_KAKAKAME | Dowels | t | ||||||||||
| KAME-LI-MELI-KANE_KAKAMETO | Diamond cutting segmented disc, diameter 800 mm, segment 4.8x10x40 mm | pcs | ||||||||||
| KAME-LI-MELI-KANE_KAKAMESA | Diamond cutting segmented circle, diameter 1000 mm, segment 4.4x10x40 mm | pcs | ||||||||||
| KAME-LI-MELI-KANE_KAKAMEDX | Diamond cutting segmented circle, diameter 600 mm, segment 4.4x10x40 mm | pcs | ||||||||||
| KAME-LI-MELI-KANE_KAKALIME | Diamond cutting segment circle, diameter 450 mm, diamond edge thickness 4 mm, diamond edge height 12 mm | pcs | ||||||||||
| KAME-LI-MELI-KADX_KAKANERI | Diamond ring drill bit, diameter 20 mm | pcs | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight ME.SA-PU.SA kg | t | ||||||||||
| KAVO-PU-KATO-KARI_KAKAKARI | Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II | m3 | ||||||||||
| MEME-RI-MEME-KARI_KAKAMEME | Bakelized plywood, grade FBS, thickness 18 mm | m3 | ||||||||||
| MEPU-RI-KAME-KANE_KAKAMERI | Paraffin emulsion film-forming coating for road works, dry matter content 15-35%, pH 7-9, color white, yellow | t | ||||||||||
| DXME-KASA-METO_KAKAME | Flatbed trucks, load capacity up to 6 tons, with crane-manipulator, load capacity 4 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KAVO-KARI_KAMEME | Hand-held asphalt spreaders | Machine hours | ||||||||||
| DXME-KAVO-KASA_KASASA | High-performance concrete paving machines Concrete pavers with sliding forms | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KASALI | High-performance concrete paving machines for applying film-forming materials | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KANERI | High-performance concrete placing machines, cement concrete distributors with sliding forms | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KANE_KAMEME | Self-propelled joint cutters for hardened concrete, maximum cutting depth 480 mm, power 62 kW (84 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KATOVO | Watering machines, tank capacity 6 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKAPU | Dump trucks, load capacity up to 30 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKARI | Mobile screw compressors with internal combustion engines, pressure up to ME.TO MPa (13 atm), capacity up to 12 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXME-RIME-RIRI_RILIME | Construction and installation guns | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||