AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KALI | Bitumen-cationic emulsion | t | ||||||||||
| ME_MEKAKA_RIME | Average work load RI.ME | hrs | ||||||||||
| KAME-TO-KASA-KAME_KAKAMEME | Technical purified aluminum sulfate, grade A | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-RIKA-KATO_KAKAMERI | Jute burlap | m2 | ||||||||||
| KARI-RI-KASA-KAPU_RIKAMEPU | Crushed rock from dense rock formations for construction work M 1200, fraction 5(3)-10 mm | m3 | ||||||||||
| KARI-TO-KAME-KASA_KAPUNERI | Sand from crushing screenings for construction works, class II, M 1200, increased size | m3 | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | t | ||||||||||
| DXME-KANE-KASA_KASALI | Single-bucket universal front pneumatic wheel loaders, nominal capacity of the main bucket ME.SA m3, load capacity 3 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAVO_KAKAME | Mixers-layers for cast emulsion-mineral mixtures, crushed stone hopper DX.RI m3, emulsion pump capacity 400 l/min | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KATORI | Road service machines (road maintenance machine), engine power 80 kW (109 hp) | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KATOVO | Watering machines, tank capacity 6 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KATO_KAPUME | Tank trucks, volume 8 m3 | Machine hours | ||||||||||
| DXME-MEPU-KALI_KAKAME | Bitumen tankers, tank capacity 16 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||