AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-TO-KALI-KAME | Hot-rolled strip | t | ||||||||||
| KADX-RI-KATO-KAPU | Aluminum structures | t | ||||||||||
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KASA-KATO_KAKAKASA | Purified ammonium sulfate (ammonium sulfate) | t | ||||||||||
| KAME-TO-KASA-KATO_KAKARIME | Double-substituted ammonium phosphate (diammonium phosphate) | t | ||||||||||
| KAME-TO-KASA-RITO_KAMEKARI | Technical silicon fluoride sodium, grade I | t | ||||||||||
| KAME-LI-MESA-MEPU_KATOMEKA | Self-tapping galvanized steel screws with countersunk head and cross-shaped slot, pointed, diameter TO.SA mm, length 16 mm | kg | ||||||||||
| KAVO-ME-KARI-MEME_KAKARIME | Simple construction forgings (brackets, fasteners, clamps), weight ME.VO kg | kg | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 1-8 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II | m3 | ||||||||||
| MEPU-ME-KARI-KAPU_KAMEKAME | Adhesive mastic, Bustilat brand | t | ||||||||||
| MEPU-PU-KARI-KAPU_KAMELISA | MA-15 oil paint, iron red | t | ||||||||||
| MEPU-PU-KATO-MEME_KAKAKAME | NC-221 varnish | t | ||||||||||
| MEPU-SA-KASA-KAME_KAKAKATO | OKSOL combined drying oil | t | ||||||||||
| RIRI-RI-KARI-RITO_KAMEDXME | Plasticizer | t | ||||||||||
| DXME-KANE-KASA_KAMENE | Forklift trucks, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||