AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAKAMEPU | Hot bitumen roofing mastic MBK-G-55, MBK-G-65, MBK-G-75, MBK-G-85, MBK-G-100 | t | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KASA-RITO_KAMERIDX | Technical sodium fluoride, grade A, type I | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAKARI | Rolled vulcanized rubber plates | kg | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight ME.SA-PU.SA kg | t | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 9-12 mm | t | ||||||||||
| KAVO-TO-KASA-KARI_KAMEKARI | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 14-24 mm | t | ||||||||||
| MEME-ME-KATO-KANE_KAKAVORI | Edged softwood board, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 20-22 mm, grade II | m3 | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKASA | Floating cranes for working in enclosed water areas, self-propelled, 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-METO_KAKARI | Diving stations on a self-propelled boat with a compressor for operation in closed water areas, power 110 kW (150 hp) | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||