| KALI-RI-KALI-METO | Metal elements | kg | ||||||||||
| MEME-RI-KANE-KARI | Glued wooden structures | m3 | ||||||||||
| ME_MEKAKA_TORI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KAKASAPU | Welding electrodes for welding low-alloy and carbon steels ANO-6, E42, diameter 6 mm | t | ||||||||||
| KAME-LI-MESA-MEPU_KAMEVOSA | Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 8 mm, length 100 mm | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight ME.SA-PU.SA kg | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III | m3 | ||||||||||
| MEPU-SA-KANE-KATO_KAKAKARI | Antiseptic paste | t | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption TO.LI kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||