AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KAME-KATO | Drill bits | pcs | ||||||||||
| KAME-PU-KAME-MEKA | Augers | pcs | ||||||||||
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KAVO-KASA_KAKAKANE | Plasticizing additive for concrete mixes | t | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KATO-RI-KAME-KARI_KAKAMERI | Portland cement with mineral additives for general construction CEM II 32.5N | t | ||||||||||
| RIKA-SA-KASA-KAME_KAKAKAME | Pulse capacitor, rated voltage 5 kV, capacity 200 μF, steel body, height with terminals 673 mm, UHL4 | pcs | ||||||||||
| RIKA-SA-KASA-KARI_KAKAKAME | Ground electrode with 22 m cable, operating voltage 5-10 kV, sleeve dimensions 60x430 mm | pcs | ||||||||||
| RIKA-SA-KASA-KATO_KAKAKAME | Controlled arrester, operating voltage 5-10 kV, service life 50,000 operations, dimensions 120x120x250 mm | pcs | ||||||||||
| DXME-KARI-KAPU_KATONE | Auger drilling rigs for the construction of bored piles based on a crawler crane with a lifting capacity of 25 tons, drilling depth up to 30 m, drilling diameter up to 600 mm, enlarged cavity diameter up to 1600 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAPU-KAME_SARIPU | Crawler-mounted drilling rigs, drilling diameter 40-406 mm, drilling depth up to 30 m | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Mortar pumps, capacity 6 m3/h | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Electricity: consumption ME.RIPU kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_SARIRI | Mobile mechanized prefabricated sectional complexes for moving equipment when installing bored piles using discharge-pulse technology, two-platform, with two winches with a pulling force of TO.RI tons, load capacity 50 tons | Machine hours | ||||||||||
| DXME-KADX-MERI_SARIRI | Electricity: consumption ME.KANE kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-METO_KAMEPU | High-voltage electric pulse installations for creating electrical discharges in the ground during the production of piles using discharge-pulse technology, maximum stored energy 40 kJ, energy storage capacity 1000 μF, output voltage control range 7-9 kV, power consumption 10 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUSA | Personnel: 2 man-hours/machine-hour | Machine hours | ||||||||||
| DXME-METO-KATO_KAPUME | Tank trucks, volume 8 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKAPU | Mobile power stations, capacity 60 kW | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||