Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KARI | Heavy concrete mixes for hydraulic structures | m3 | ||||||||||
| MEME-ME-KATO-KANE | Boards | m2 | ||||||||||
| ME_MEKAKA_PURI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIDX_KAMEMEME | Resin-impregnated tow | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 950 mm, surface density 190 g/m2 | 10 m | ||||||||||
| RITO-SA-KARI-KARI_KAKALIVO | Straight seam electric welded steel pipes made of St2 and 10 steel grades, outer diameter 159 mm, wall thickness 8 mm | m | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAVO_KAKALI | Pneumatic wheeled cranes, lifting capacity 30 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKASA | Floating cranes for working in enclosed water areas, self-propelled, 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 man-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-METO_KAKARI | Diving stations on a self-propelled boat with a compressor for operation in closed water areas, power 110 kW (150 hp) | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|